[472] | 1 | Deliverables: Goals to achieve |
---|
| 2 | ------------------------------ |
---|
| 3 | |
---|
| 4 | Per 4/7/2004: |
---|
| 5 | ----------- |
---|
| 6 | |
---|
| 7 | 1:Finite volume simulations of water flow in a large (10-20 thousand volumes) |
---|
| 8 | general domain (runtime < 24 hours) |
---|
| 9 | Done |
---|
| 10 | |
---|
| 11 | 2:Suitable visualisation |
---|
| 12 | |
---|
| 13 | 3:Verification against analytical solutions |
---|
| 14 | |
---|
| 15 | 4:Parallel capability (later) |
---|
| 16 | |
---|
| 17 | 5:Incorporation of friction, windfields and tides. |
---|
| 18 | |
---|
| 19 | |
---|
| 20 | Year 4/5: |
---|
| 21 | --------- |
---|
| 22 | |
---|
| 23 | 0. Maly Vale consultancey and two trips to Merimbula (C) |
---|
| 24 | August 2004 |
---|
| 25 | |
---|
| 26 | 1. Model Description Report |
---|
| 27 | (Description, mathematics and algorithms behind the storm surge model) |
---|
| 28 | Chris, Stephen (September 2004) |
---|
| 29 | |
---|
| 30 | Merimbula case study, (November 2004) |
---|
| 31 | |
---|
| 32 | 2. Reference Manual (How the programming framework is structured) |
---|
| 33 | Ole, Duncan, Stephen (November 2004) |
---|
| 34 | |
---|
| 35 | 3. User Manual (How to use the model) |
---|
| 36 | Ole, Duncan, Chris, Stephen (November 2004) |
---|
| 37 | |
---|
| 38 | 4. Two papers on the comparison of the model with existing |
---|
| 39 | storm surge models and actual data. |
---|
| 40 | Ole, Duncan, Chris, Stephen (December 2004) |
---|
| 41 | |
---|
| 42 | 5. Send model to review, (Chris February 2004) |
---|
| 43 | |
---|
| 44 | 6. Single processor version of the Storm Surge hazard model |
---|
| 45 | released on CD or on the net integrating the |
---|
| 46 | Storm Surge model, animation, pMesh, examples and case study. |
---|
| 47 | Ole, Duncan, Chris, Stephen (April 2005) |
---|
| 48 | |
---|
| 49 | 7. Parallel implementation of the Storm Surge model released |
---|
| 50 | Ole, Duncan, Stephen (June 2005) |
---|
| 51 | |
---|
| 52 | |
---|
| 53 | 8. Wave modelling, Stephen (May 2005) |
---|
| 54 | |
---|
| 55 | Bushfire (D+C) July |
---|
| 56 | Viz (O+D) Oct |
---|
| 57 | |
---|
| 58 | Beowulf Ole, Duncan (March 2005) |
---|
| 59 | |
---|
| 60 | Travel logic: |
---|
| 61 | -------------- |
---|
| 62 | 1 trip to Manly Vale (Sydney) in August |
---|
| 63 | 1 trip to Merimbula in August |
---|
| 64 | 1 Trip to Merimbula when work is being done (August or September) |
---|
| 65 | 1 trip to Manly Vale (Sydney) in September to wrap up |
---|
| 66 | |
---|
| 67 | |
---|
| 68 | Year 5/6 and beyond |
---|
| 69 | -------------------- |
---|
| 70 | |
---|
| 71 | 7. Integration of Storm Surge model with iFlood (Dec 2005) |
---|
| 72 | |
---|
| 73 | 8. Investigation of modelling of surface waves in Storm Surge model Chris, Stephen (June 2005) |
---|
| 74 | |
---|
| 75 | |
---|
| 76 | GUI ? |
---|