Changeset 2343
- Timestamp:
- Feb 7, 2006, 11:57:44 AM (19 years ago)
- File:
-
- 1 edited
Legend:
- Unmodified
- Added
- Removed
-
documentation/planning/priorities.tex
r2342 r2343 5 5 6 6 7 \date{ 6February, 2006} % update before release!7 \date{7 February, 2006} % update before release! 8 8 % Use an explicit date so that reformatting 9 9 % doesn't cause a new date to be used. Setting … … 44 44 45 45 46 \section*{ specific case studies}46 \section*{Specific case studies} 47 47 48 48 The list in order of importance but subject to availability of … … 50 50 51 51 \begin{enumerate} 52 \item Onslow, WA. This study (to be completed FY 0506)mainly supports the FESA funded WA study, but has synergies with52 \item Onslow, WA. This study mainly supports the FESA funded WA study, but has synergies with 53 53 projects in other lists as well (Jane, Ole, Nick) 54 \item Port Hedland. Also part of the WA project (completion FY 0506). (Jane, Nick) 55 \item Wrap up Sydney (Benfield) project including refinements and damage modelling (preferably 56 completed FY 0506). 54 \item Wrap up Sydney (Benfield) project including refinements and damage modelling. 57 55 This project has synergies with the ANUGA Demo initiative (Everyone) 56 \item Port Hedland. Also part of the WA project. (Jane, Nick) 58 57 \item NSW state study 59 58 \item SE Qld study … … 62 61 within the next 12 months) and consultation has occurred with stakeholders. 63 62 \end{enumerate} 64 No more than priority 1- 3 are expected to complete before 20 June 2006.63 No more than priority 1-2 are expected to complete before 30 June 2006. 65 64 66 65 … … 76 75 \item Momentum sink study (Duncan) 77 76 \item Landslide modelling paper with Dr Mueller, Sydney (Jane, Ole, Adrian) 78 \item Effect of debris (?)79 77 \item Automatic definition of mesh-resolution based on data values (Duncan) 78 \item Effect of debris on flow and damage 80 79 \item Write ANUGA in term of latitudes and longitudes 81 \item Coriolis effect80 \item Incorporate coriolis effect for large study areas 82 81 \item Revive storm surge model 83 82 \item Riverine flooding 84 \item Solution uncertainty (interaction with Hugh Durrant-Whyte and Kumar from USyd) 85 \item Scenario database (future); this could complement the ATWS operational centre. (how often 86 would it need to be updated, i.e how long will the results remain valid? 87 eg, effect of sediment transport affecting local bathymetry, change 88 in sea levels due to climate change) 83 \item Solution uncertainty (interaction with Hugh Durrant-Whyte and 84 Suresh Kumar from USyd) 85 \item Scenario database (future); this could complement the ATWS 86 operational centre. (how often would it need to be updated, i.e how 87 long will the results remain valid? eg, effect of sediment transport 88 affecting local bathymetry, change in sea levels due to climate 89 change) 89 90 \end{enumerate} 90 No more than priority 1-4 are expected to complete before 20 June 2006.91 No more than priority 1-4 are expected to complete before 30 June 2006. 91 92 92 93 … … 112 113 113 114 \end{enumerate} 114 It is the hope that all these priorities will be adressed before 20 June 2006.115 It is the hope that most of these priorities will be adressed before 30 June 2006. 115 116 116 117
Note: See TracChangeset
for help on using the changeset viewer.