Changeset 2343


Ignore:
Timestamp:
Feb 7, 2006, 11:57:44 AM (18 years ago)
Author:
ole
Message:

Rearranged priorities

File:
1 edited

Legend:

Unmodified
Added
Removed
  • documentation/planning/priorities.tex

    r2342 r2343  
    55
    66
    7 \date{6 February, 2006}         % update before release!
     7\date{7 February, 2006}         % update before release!
    88                                % Use an explicit date so that reformatting
    99                                % doesn't cause a new date to be used.  Setting
     
    4444
    4545
    46 \section*{specific case studies}
     46\section*{Specific case studies}
    4747
    4848The list in order of importance but subject to availability of
     
    5050
    5151\begin{enumerate}
    52   \item Onslow, WA. This study (to be completed FY 0506) mainly supports the FESA funded WA study, but has synergies with
     52  \item Onslow, WA. This study mainly supports the FESA funded WA study, but has synergies with
    5353    projects in other lists as well (Jane, Ole, Nick)
    54   \item Port Hedland. Also part of the WA project (completion FY 0506). (Jane, Nick)
    55   \item Wrap up Sydney (Benfield) project including refinements and damage modelling (preferably
    56 completed FY 0506).
     54  \item Wrap up Sydney (Benfield) project including refinements and damage modelling.
    5755    This project has synergies with the ANUGA Demo initiative (Everyone)
     56  \item Port Hedland. Also part of the WA project. (Jane, Nick)
    5857  \item NSW state study 
    5958  \item SE Qld study
     
    6261within the next 12 months) and consultation has occurred with stakeholders.
    6362\end{enumerate}
    64 No more than priority 1-3 are expected to complete before 20 June 2006.
     63No more than priority 1-2 are expected to complete before 30 June 2006.
    6564
    6665
     
    7675  \item Momentum sink study (Duncan)
    7776  \item Landslide modelling paper with Dr Mueller, Sydney (Jane, Ole, Adrian) 
    78   \item Effect of debris (?)
    7977  \item Automatic definition of mesh-resolution based on data values (Duncan)
     78  \item Effect of debris on flow and damage
    8079  \item Write ANUGA in term of latitudes and longitudes
    81   \item Coriolis effect
     80  \item Incorporate coriolis effect for large study areas
    8281  \item Revive storm surge model
    8382  \item Riverine flooding
    84   \item Solution uncertainty (interaction with Hugh Durrant-Whyte and Kumar from USyd)
    85   \item Scenario database (future); this could complement the ATWS operational centre. (how often
    86  would it need to be updated, i.e how long will the results remain valid?
    87 eg, effect of sediment transport affecting local bathymetry, change
    88 in sea levels due to climate change)
     83  \item Solution uncertainty (interaction with Hugh Durrant-Whyte and
     84  Suresh Kumar from USyd)
     85  \item Scenario database (future); this could complement the ATWS
     86 operational centre. (how often would it need to be updated, i.e how
     87 long will the results remain valid?  eg, effect of sediment transport
     88 affecting local bathymetry, change in sea levels due to climate
     89 change)
    8990\end{enumerate}
    90 No more than priority 1-4 are expected to complete before 20 June 2006.
     91No more than priority 1-4 are expected to complete before 30 June 2006.
    9192
    9293
     
    112113 
    113114\end{enumerate}
    114 It is the hope that all these priorities will be adressed before 20 June 2006.
     115It is the hope that most of these priorities will be adressed before 30 June 2006.
    115116
    116117
Note: See TracChangeset for help on using the changeset viewer.