    r2724 r2725  
    5555
    5656\begin{enumerate}
    57   \item Onslow, WA. This study mainly supports the FESA funded WA study, but has synergies with
    58     projects in other lists as well (Jane, Ole, Nick)
     57  \item Onslow, WA - end of June 06. This study mainly supports the FESA funded WA study, but has synergies with
     58    projects in other lists as well (Nick with support from Ole and Jane)
    5959  \item Complete Sydney (Benfield) project. Refinements have included addressing water loss through
    6060the form of the surface elevation function, boundary conditions,
     
    6565to Benfield by Fri 28 April noting the latter two issues are still outstanding.
    6666    This project has synergies with the ANUGA Demo initiative (Everyone)
    67   \item Port Hedland. Also part of the WA project. (Jane, Nick)
     67  \item Port Hedland - end of June 06. Also part of the WA project. (Nick and Jane)
    6868  \item Rerun Wollongong with slump (pending better defition of slump sizes) (Nick, Adrian), 2-3 weeks
    6969  \item NSW state study  (deferred until 2007 - Matt)