  • documentation/planning/priorities.tex

    r2725 r2728  
    22       
    33\documentclass[11pt]{report}
     4\usepackage{graphicx}
    45
    56\title{AnuGA Inundation Modelling Project - Planning and Priorities - Draft}
     
    5556
    5657\begin{enumerate}
    57   \item Onslow, WA - end of June 06. This study mainly supports the FESA funded WA study, but has synergies with
    58     projects in other lists as well (Nick with support from Ole and Jane)
    59   \item Complete Sydney (Benfield) project. Refinements have included addressing water loss through
    60 the form of the surface elevation function, boundary conditions,
    61 friction creep and issues with ill-conditioned system
    62 as a result of a complex internal polygon. Whilst a protection has been put in place for friction
    63 creep, the issue is still outstanding. The ill-conditioned nature of the system remains an outstanding
    64 issue and is related to the conjugate gradient solver not converging. Final results will be delivered
    65 to Benfield by Fri 28 April noting the latter two issues are still outstanding.
    66     This project has synergies with the ANUGA Demo initiative (Everyone)
    67   \item Port Hedland - end of June 06. Also part of the WA project. (Nick and Jane)
     58  \item Onslow, WA - end of June 06. This study mainly supports the
     59    FESA funded WA study, but has synergies with projects in other
     60    lists as well (Nick)
     61  \item Complete Sydney (Benfield) project (Jane). Refinements have
     62    included addressing water loss through the form of the surface
     63    elevation function, boundary conditions, friction creep and issues
     64    with ill-conditioned system as a result of a complex internal
     65    polygon. Whilst a protection has been put in place for friction
     66    creep, the issue is still outstanding. The ill-conditioned nature
     67    of the system remains an outstanding issue and is related to the
     68    conjugate gradient solver not converging. Final results will be
     69    delivered to Benfield by Fri 28 April noting the latter two issues
     70    are still outstanding.  This project has synergies with the ANUGA
     71    Demo initiative (Everyone)
     72  \item Port Hedland - end of June 06. Also part of the WA project. (Nick)
    6873  \item Rerun Wollongong with slump (pending better defition of slump sizes) (Nick, Adrian), 2-3 weeks
    6974  \item NSW state study  (deferred until 2007 - Matt)
     
    7479\end{enumerate}
    7580Given that the production line is in a start-up phase and the needs
    76 outlined in the research and development streams, only priority 1 and
    77 2 are guaranteed to complete before 30 June 2006. However, once
     81outlined in the research and development streams, only priority 1 to 3
     82are guaranteed to complete before 30 June 2006. However, once
    7883streamlined, we expect a production rate of about one scenario per
    79 month. A number of these studies may not be conducted by the team, however, assistance will certainly
    80 be required.
     84month (subject to availability of computational resources and data).
     85A number of these studies may not be conducted by the team, however,
     86our assistance will certainly be required.
    8187
    8288
     
    8894\begin{enumerate}
    8995  \item Sensitivity study using Onslow project (Jane, Ole)
    90   \item Validation (Ole et al with David Burbidge \& Tom Baldock UQ). Also PDC and Suva data.
     96  \item Validation:
     97  \begin{itemize}
     98    \item Onslow tide gauges (Ole with David Burbidge)
     99    \item Boxing day event (ANU contract with Asavanant and Grilli)
     100    \item Friction validation (Duncan with Tom Baldock UQ)
     101    \item PDC (Ole)
     102    \item 1953 Suvadata from Tariq (someone)
     103  \end{itemize}
     104   
    91105  \item Comparison of MOST and ANUGA over a stretch of deep water. Also, where to pick up boundary condition.
    92106  \item Momentum sink study (Duncan)
     
    94108  \item Submarine landslide modelling paper with Dr Mueller or Russell Blong (Ask him), Sydney (Jane, Ole, Adrian, Matt). Perhaps use Wollongong as the study area. 
    95109  \item Probabilistic integration with URS model, pending URS data (Ole, Trevor).  Ask PDC. 
     110  \item Effect of the GBR based on new LADS data (which we need to get from Phil O'brien). This could become a graduate program, an ANU contract or a job for an ANU summer scholar.
    96111  \item Automatic definition of mesh-resolution based on data (e.g. depth or gradients). Perhaps use wavelet transforms. Stephen has a link to a researcher at Imperial College, London.
    97112  \item Investigate behaviour near steep and shallow bathymetries, where artifitial fluxes may be generated.
     
    143158
    144159
    145 \subsection*{Inundation modelling team}
     160\subsection*{Inundation modelling team (IMP)}
    146161\begin{enumerate}
    147162  \item \textbf{Duncan}: Take responsibility for the code development and maintenance.
     
    157172  \item \textbf{Nick}: Take responsibility for the production stream, develop visualisation techniques,
    158173  and contribute to code development on a needs basis. Other responsibilities include
    159 \begin{itemize}
     174  \begin{itemize}
    160175  \item TRIM
    161176  \end{itemize}
     
    163178  Manage the balance and requirements between the research, development and production stream.
    164179  Take responsibility for the code development and maintenance as well as one or more research projects.
    165   Contribute to production on a needs basis.   Other responsibilities include
    166 \begin{itemize}
    167   \item PUG
     180  Contribute to production on a needs basis. Other responsibilities include
     181  \begin{itemize}
     182  \item Programmers User Group and High Performance Computing issues.
    168183  \end{itemize}
    169184\end{enumerate}
    170185
    171186
    172 \subsection*{Stakeholders}
    173 \begin{enumerate}
    174   \item \textbf{Adrian or Monica}: Provide input to submarine landslide research.
    175   \item \textbf{Hamish and Kathyrn Tobin}: Coordinate collection and supply of topographic and bathymetric data.   
    176   \item \textbf{Neil and Ingo}: Coordinate development of GIS decision tool.
     187\subsection*{Digital Elevation Modelling Team (DEM)}
     188\begin{enumerate}
     189  \item \textbf{Hamish Anderson}: Coordinate collection and supply of
     190  topographic and bathymetric data.   
     191  \item \textbf{Kathryn Tobyn}: Bathymetric data specialist.     
     192\end{enumerate}   
     193
     194\subsection*{Earthquake and Tsunami Hazards (ETH)}
     195\begin{enumerate}
     196  \item \textbf{David Burbidge}: Link to URS data
     197  \item \textbf{Phil Cummins}: Team leader
     198\end{enumerate}   
     199
     200\subsection*{GIS team}
     201\begin{enumerate}
     202  \item \textbf{Neil Corby}: Coordinate development of GIS decision tool.
    177203    Assist with collection and supply of topographic data. 
    178   \item \textbf{Stephen}: Contribute to research and further development of hydrodynamic model.   
    179   \item \textbf{Trevor}: Develop new engagements with external stakeholders such as state governments. 
    180   \item \textbf{Lisa}: Arcview exposure database with Neil
    181  
     204  \item \textbf{Ingo Hartig}: Development of GIS decision tool.
     205    Assist with collection, supply and validation of topographic data.   
     206    Assist IMP with genaral GIS visualisation. 
     207  \item \textbf{Lisa Cornish}: Arcview exposure database with Neil
     208\end{enumerate}   
     209
     210
     211\begin{figure}
     212
     213  \centerline{ \includegraphics[width=75mm, height=75mm]{information_flow.eps}}
     214
     215
     216\caption{Diagram showing information flow among the teams comprising the FESA project.}
     217\label{fig:information flow}
     218\end{figure}
     219
     220
     221\subsection*{Other stakeholders}
     222\begin{enumerate}
     223  \item \textbf{Stephen Roberts (ANU)}: Contribute to research and further development of
     224  ANUGA.   
     225  \item \textbf{Linda Stals (ANU)}: Develop parallel version of ANUGA.     
     226  \item \textbf{Adrian Hitchman and Monica Osuchowski}: Provide input to submarine landslide research.
     227  \item \textbf{Trevor Dhu}: Develop new engagements with external
     228  stakeholders such as state governments. Assist with development of probabilistic modelling.
    182229  \item Others?
    183230\end{enumerate}
     231
     232
    184233   
    185234\subsection*{Potential contacts}