Changeset 2856
- Timestamp:
- May 12, 2006, 3:06:56 PM (17 years ago)
- File:
-
- 1 edited
Legend:
- Unmodified
- Added
- Removed
-
documentation/planning/priorities.tex
r2833 r2856 64 64 with ill-conditioned system as a result of a complex internal 65 65 polygon. Whilst a protection has been put in place for friction 66 creep, the issue is still outstanding. The ill-conditioned nature 67 of the system remains an outstanding issue and is related to the 68 conjugate gradient solver not converging. Final results will be 69 delivered to Benfield by Fri 28 April noting the latter two issues 70 are still outstanding. This project has synergies with the ANUGA 66 creep, the issue is still outstanding. Final results will be 67 delivered to Benfield by Fri 28 April noting the friction issue 68 is still outstanding. This project has synergies with the ANUGA 71 69 Demo initiative (Everyone) 72 70 \item Port Hedland - end of June 06. Also part of the WA project. (Nick) … … 124 122 \item Boxing day event (ANU contract 2006/2007 with Asavanant and Grilli) 125 123 \item Friction validation (Duncan with Tom Baldock UQ) 126 Duncan to get a sense of scope on this by June 200 3.124 Duncan to get a sense of scope on this by June 2006. 127 125 Work to be done in 2006/2007. 128 126 \item PDC (Ole) 129 127 Ole to visit Pacifit Disaster Center in 6/7 130 \item 1953 Suva data from Tariq (someone)128 \item 1953 Suva data from Tariq (someone) 131 129 Date is available. Ole to arrange for unpacking with GIS and scope project. 132 130 Could form a graduate project. … … 135 133 \item Momentum sink study (Duncan with Nick Dando) 136 134 Report and talk by end of June 2006. Paper later. 137 \item Submarine landslide modelling paper with Dr Mueller or Russell Blong (Ask him), Sydney (Jane, Ole, Adrian, Matt). Perhaps use Wollongong as the study area. 135 \item Submarine landslide modelling paper with Dr Mueller or Russell Blong (Ask him), Sydney (Jane, Ole, Adrian/Monica, Matt). 136 Perhaps use Wollongong as the study area. 138 137 \item Probabilistic integration with URS model, pending URS data (Ole, Trevor). Ask PDC. 139 \item Effect of the GBR based on new LADS data (which we need to get from Phil O'brien). This could become a graduate program, an ANU contract or a job for an ANU summer scholar. 138 \item Effect of the GBR based on new LADS data (which we need to get from Phil O'brien). 139 This could become a graduate program, an ANU contract or a job for an ANU summer scholar. 140 \item Comparing calculated run-up height with Synolakis' approximation 141 ($R = A^\frac{4}{5} h^ \frac{1}{5}$ where $A$ is the amplitude at some offshore location 142 and $h$ is the depth at the same offshore location). Calculate the maximum elevation 143 at which there is water. Need to confirm definition of run-up height. 144 \item Incorporate asteroid model (parabolic cavity) as an initial condition into ANUGA. 145 Compare calculated extent with the approximation of 146 run-in (or maximum extent) from Chesley and Ward 2006 where the run-in distance is approximated 147 by $X \approx 10 \sqrt{g R} D^\frac{3}{8}$ where $R$ is the run-up height and $D$ is the 148 asteroid diameter. Allows another event to be added to the overall 149 tsunami risk assessment. This could become a graduate or student project. 140 150 \item Scenario database (future); this could complement the ATWS 141 151 operational centre. (how often would it need to be updated, i.e how … … 230 240 \subsection*{Earthquake and Tsunami Hazards (ETH)} 231 241 \begin{enumerate} 232 \item \textbf{David Burbidge}: Link to URS data 242 \item \textbf{David Burbidge}: Link to URS data; developing probabilistic hazard map 233 243 \item \textbf{Phil Cummins}: Team leader 234 244 \end{enumerate} … … 302 312 \begin{itemize} 303 313 \item \textbf{Duncan}: 4 days/week 304 \item \textbf{Jane}: Leave from15 June 2006 to 15 July 2006314 \item \textbf{Jane}: Three weeks leave in the period 15 June 2006 to 15 July 2006 305 315 Ole to cover Jane's commitments. 306 316 \item \textbf{Nick}: Leave from 22 August 2006 to 13 October 2006 307 317 Duncan to cover off on the production line. 308 318 \item \textbf{Ole}: Leave for six weeks around August or September. 309 Jane to be acting team leader. 319 Jane to be acting team leader with Duncan responsible for 320 software and maintenance issues. 310 321 \end{itemize} 311 322
Note: See TracChangeset
for help on using the changeset viewer.