Changeset 3317


Ignore:
Timestamp:
Jul 12, 2006, 10:10:55 AM (18 years ago)
Author:
sexton
Message:

maps for report

Location:
production/onslow_2006
Files:
2 added
3 edited

Legend:

Unmodified
Added
Removed
  • production/onslow_2006/report/HAT_map.tex

    r3252 r3317  
    11\begin{figure}[hbt]
    2 %\centerline{ \includegraphics[width=100mm, height=75mm]{../report_figures/.jpg}} 
     2\centerline{ \includegraphics[width=100mm, height=75mm]{../report_figures/high tide 20060704_063005.jpg}} 
    33\caption{Maximum inundation map for the HAT scenario for Onslow region.} 
    44\label{fig:HAT_max_inundation}
  • production/onslow_2006/report/MSL_map.tex

    r3252 r3317  
    11\begin{figure}[hbt]
    2 %\centerline{ \includegraphics[width=100mm, height=75mm]{../report_figures/.jpg}} 
     2\centerline{ \includegraphics[width=100mm, height=75mm]{../report_figures/mid tide 20060704_063234.jpg}} 
    33\caption{Maximum inundation map for the MSL scenario for Onslow region.} 
    44\label{fig:MSL_max_inundation}
  • production/onslow_2006/report/interpretation.tex

    r3268 r3317  
    9494exceeding 1m found at the Beadon Creek south of dock location (Figure
    9595\ref{fig:20060515001733gaugeBeadonCreeksouthofdock}).
    96 %The wave penetrates the river east of Onslow with increasingly
    97 %greater inundation between the -1.5m AHD and 1.5m AHD simulations.
     96The wave penetrates the river east of Onslow with increasingly
     97greater inundation between the -1.5m AHD and 1.5m AHD simulations.
    9898
    99 %As expected, there is greater inundation at 1.5m AHD. The major road
    100 %into Onslow, the Onslow Mount Stuart Rd, remains free of inundation for
    101 %all simulations. Beadon Creek Rd which services the wharf in the
    102 %river becomes increasingly inundated as the initial condition
    103 %changes from 0m AHD to 1.5m AHD. Only the
    104 %entry to the wharf on Beadon Creek Rd is sufficiently inundated at -1.5m AHD
    105 %to stop traffic. At 1.5m AHD however, essentially the entire road
    106 %would be impassable.
     99As expected, there is greater inundation at 1.5m AHD. The major road
     100into Onslow, the Onslow Mount Stuart Rd, remains free of inundation for
     101all simulations with a small amount of inundation evident at HAT at
     102the intersection with Beadon Creek Rd. Beadon Creek Rd services the wharf in the
     103river which becomes increasingly inundated as the initial condition
     104changes from 0m AHD to 1.5m AHD. Only the
     105entry to the wharf on Beadon Creek Rd is sufficiently inundated at -1.5m AHD
     106to stop traffic. At 1.5m AHD however, essentially the entire road
     107would be impassable.
    107108
    108 %There is significant inundation of at
    109 %least 2m on the foreshore of Onslow for 0m AHD and 1.5m AHD.
    110 %The inundation extent increases the initial condition increases above 0m AHD,
    111 %pushing the edges
    112 %of the majority of the road infrastructure in the Onslow town centre.
    113 There is significant inundation of at least 2m on the foreshore of Onslow.
    114 The major road into Onslow, the Onslow Mount Stuart Rd, remains free
    115 of inundation, however there is some inundation on Beadon Creek Rd
    116 which services the wharf in the river.
     109There is significant inundation of at
     110least 2m on the foreshore of Onslow for 0m AHD and 1.5m AHD.
     111The inundation extent increases the initial condition increases above 0m AHD,
     112pushing the edges
     113of the majority of the road infrastructure in the Onslow town centre.
Note: See TracChangeset for help on using the changeset viewer.