Timeline
Sep 3, 2014:
- 3:47 PM Changeset [9320] by
- Adding a template tsunami script + associated source adjustments
- 11:37 AM Changeset [9319] by
- added unit test for Rudy's degenerate triangle
Sep 2, 2014:
- 5:16 PM Changeset [9318] by
- Fixing comment
Sep 1, 2014:
- 11:14 PM Changeset [9317] by
- Getting all_tests_produce_results working with -np -alg and -v arguments
- 9:14 PM Changeset [9316] by
- Updated validation readme
- 12:10 AM Changeset [9315] by
- removed cfl reference
Aug 31, 2014:
- 11:16 PM Changeset [9314] by
- Getting rid of cfl reference
- 10:23 PM Changeset [9313] by
- Import error
- 10:17 PM Changeset [9312] by
- updated import to set_w_uh_vh_operator
- 10:05 PM Changeset [9311] by
- Error setting cfl
- 9:19 PM Changeset [9310] by
- adding in function to create parameters.tex files
- 9:15 PM Changeset [9309] by
- small changes plot_utils
- 9:05 PM Changeset [9308] by
- cleaing up validation tests
Aug 30, 2014:
- 8:57 PM Changeset [9307] by
- Upped theerror tolerance for carrier_greenspan_periodic
Aug 15, 2014:
- 4:48 PM Changeset [9306] by
- Cleaning up C interface for DE functions
- 12:52 PM Changeset [9305] by
- Adjustment to collect_max_quantities operator
Aug 14, 2014:
- 11:17 AM Changeset [9304] by
- Bugfix in polygon reading routine
- 10:33 AM Changeset [9303] by
- Fixing up recent plot_utils improvements
Aug 13, 2014:
- 11:22 PM Changeset [9302] by
- Added code to ensure_numeric to ensure output arrays are contiguous
- 5:38 PM Changeset [9301] by
- Testing if pypar_available before importing sequenential_distribute code
- 5:24 PM Changeset [9300] by
- Conflicts: anuga_core/source/anuga/utilities/plot_utils.py
- 5:11 PM Changeset [9299] by
- Smoother interpolation for makeGeotif + speedups in …
- 11:06 AM Changeset [9298] by
- Getting rid of the old shell script (python xy doesn't seem to provide …
- 11:00 AM Changeset [9297] by
- Changed shell script to python script in Makefile
- 10:57 AM Changeset [9296] by
- Added in a python versoin of the shell script get_module
Aug 12, 2014:
- 5:26 PM Changeset [9295] by
- Picked up another problematic comment in a metis make file
- 3:49 PM Changeset [9294] by
- Put back sequential distribute code into anuga as the error seems to …
- 3:14 PM Changeset [9293] by
- Changedthe anuga init to not import the sequential load and dump
- 12:10 PM Changeset [9292] by
- Adding local extrapolation and flux updating
Aug 11, 2014:
- 5:13 PM Changeset [9291] by
- Fixed typo in error message for pymetis
- 5:03 PM Changeset [9290] by
- Getting rid of come prints from get_water_volume.
Aug 8, 2014:
- 2:52 PM Changeset [9289] by
- Changed compile_all to compile pymetis even if pypar not installed
- 2:51 PM Changeset [9288] by
- Adding function to print location of triangle with smallest time step …
Aug 6, 2014:
- 9:14 AM Changeset [9287] by
- Fixed bug in volume reporting with negative rate operators
Aug 5, 2014:
- 12:11 PM Changeset [9286] by
- Updates
- 12:11 PM Changeset [9285] by
- Updates to mass conservation
- 12:11 PM Changeset [9284] by
- Adding reporting of mass conservation
- 12:11 PM Changeset [9283] by
- Bug fix
- 12:11 PM Changeset [9282] by
- Bugfixes for fractional step volume integral
- 12:11 PM Changeset [9281] by
- Adding fractional_step_volume_influx to track mass addition by operators
- 12:11 PM Changeset [9280] by
- Adding rate_integral tracking (for mass conservation checks) to …
Aug 4, 2014:
- 1:15 PM Changeset [9279] by
- Bugfix in riverwall export to txt routine
- 12:45 PM Changeset [9278] by
- Adding collect_max_quantities_operator
Note: See TracTimeline
for information about the timeline view.