Timeline
Aug 14, 2006:
- 12:19 PM Ticket #89 (Have Minimum Water depth accessable when executing run script) created by
- currently the min water depth is hard wired in the code... somewhere …
- 11:58 AM Ticket #15 (Search for appropriate procedure for OSS release ) closed by
- duplicate: in oles ppr
- 11:56 AM Ticket #38 (pmesh2Domain should have its own directory) closed by
- invalid
- 11:44 AM Ticket #64 (cg_solve error) closed by
- fixed
- 11:39 AM Ticket #55 (Negative stage values have been observed in e.g. the Sydney study.) closed by
- duplicate: see ticket:53
- 11:19 AM Ticket #57 (Move general_mesh, mesh and mesh_factory from pyvolution into separate dir ) closed by
- invalid
- 11:16 AM Ticket #85 (Problem with boundary conditions being interpolated incorrectly to ...) closed by
- fixed
- 11:13 AM Ticket #76 (Allow job recovery after a node crash) closed by
- duplicate
- 11:06 AM Ticket #66 (Problem with large meshes and cache) closed by
- fixed
- 10:47 AM Ticket #52 (Investigate reproducibility of model runs) closed by
- fixed
- 10:45 AM Ticket #50 (Write module for timeseries plotting and report generation) closed by
- fixed
- 10:44 AM Ticket #51 (Integrated damage modelling) closed by
- fixed
Aug 2, 2006:
Note: See TracTimeline
for information about the timeline view.